Please enable JavaScript to use this website fully.

0800 030 6041

View Menu

Spectrum Interiors

Case Studies

Operating theatre hatches

11th March 2016 Go to Medical Sector →

This project had to be designed very accurately to certain specification and installed in certain shifts due to the theatres being high in usage much of the time. On one installation programme, our team was ordered to pack up and out as soon as possible – there was an emergency operation needed in that room!
The hatches are smart and functional; they had to be very durable and resilient to everyday demands.

← Back to Case Studies