PE Block Refurbishment
Project Overview
Over the summer holidays, the PE block underwent a comprehensive refurbishment, transforming the space to enhance functionality and modernize its facilities. The project operated under a tight timescale, requiring an efficient and expeditious design process to ensure timely completion.
Phased Approach & Execution
To maximize efficiency, a phased approach was implemented, allowing preparatory work to take place during term time ahead of the summer break. This strategic scheduling ensured that major construction activities could proceed without disruption once the holidays began.
Scope of Work
The refurbishment included a full-scale fit-out, encompassing:
- Demolition & Structural Modifications – including a small extension to optimize space.
- Interior Works – installation of partitions, flooring, ceilings, and decoration.
- Mechanical & Electrical Upgrades – integration of air conditioning, lighting, and power systems.
- Specialist Joinery & Facilities – construction of kitchens, toilets, and staff areas.
- Sports & Gym Enhancements – installation of a new sports floor, gym fit-out, and upgraded classrooms & changing rooms.
Challenges & Successful Delivery
Despite the ambitious timeline and complex scope, the project team successfully navigated logistical and construction challenges to deliver the refurbishment on time and within budget. Through meticulous planning, coordinated execution, and collaborative problem-solving, the PE block now stands as a modern, high-quality facility that meets the needs of students and staff alike.